Awarded Projects

Awarded Public Works Projects

The Board is required to post certain information related to all public works projects awarded by Nevada government agencies. This requirement is detailed in Nevada Revised Statute 338, resulting from the 2011 Nevada Legislative Session, Senate Bill 268. After the government agency completes the form and emails it to the Board, the awarded project information will be posted on this page. Click here for the form.

Date
Company
Agency Name
Project
Preference
04/18/2019
BNP Associates
Clark County
2494 T3 Inbound Baggage Handling Sys Upgrades & Study
no
Description: Completion of a T3 domestic and international baggage claim study and validation performance study of the baggage handling system, design expansion of 3 international claim devices, and construction support services for the T3 inbound baggage handling system upgrades and study at McCarran International Airport.
04/16/2019
EASTERN SIERRA ENGINEERING
CITY OF RENO
WILKINSON PARK RECREATIONAL COURT
no
Description: 2'' AC OVERLAY, BASKETBALL HOOP, PICKLEBALL NETS, ACRYLIC COLOR COAT MATERIALS TESTING (ASPHALT)
04/16/2019
CONSTRUCTION MATERIALS ENGINEERS, INC.
CITY OF RENO
LAS BRISAS SKATEPARK
no
Description: NEW SKATEPARK AT LAS BRISAS PARK - CONCRETE AND SOIL TESTING, SPECIAL INSPECTION FOR STEEL REINFORCEMENT
04/15/2019
Black Eagle Consulting Inc.
Carson City
Ross Gold Park Testing
no
Description: Black Egle and Associates will be doing materials testing for the Ross Gold Project. Testing to include concrete testing. asphalt testing, and compaction density testing.
04/15/2019
CME
Carson City
Long Ranch Park Testing
no
Description: CME Will be doing materials testing for the Long Ranch Park Project. Testing will include concrete testing, asphalt testing, and compaction density testing.
04/09/2019
Lumos and Associates, Inc.
Carson City
FY19 Pavement Preservation Testing
no
Description: Lumos and Associates will be doing materials testing for a type 3 modified rapid setting slurry seal project for Carson City. The testing will include paint thickness, emulsion testing, aggregate testing, sieve analysis, aggregate durability testing, compaction testing and other tests as requested by Carson City.
04/08/2019
HDR
Truckee Meadows Water Authority
Little Washoe Lake Dam Assessment
no
Description: Engineering/Technical Support Related to Washoe Lake
04/08/2019
CA Group, Inc.
Regional Transportation Commission of Washoe County
Bus stop Improvement and Connectivity Program
no
Description: Friem to preform engineering, desgin, construction management and quality assurance services in connection with the Project. This Program is a multi-year effort to upgrade existing bus stops & access with state and federal ADA requirements. This is a Master Service Agreement that will allow RTC to issue Task Orders to the firm on an annual basis, not to exceed 3 years.
04/08/2019
Ashley & Vance Engineering
Carson City
Structural Engineering Services for Well Generator Pads
no
Description: Ashley Vance is providing structural engineering services for four permanent generator pads for Carson City Public Works
04/04/2019
TY Lin International
Clark County
Sloan Lane Vegas Valley Drive to Ruby Creek Drive
no
Description: Roadway improvements along Sloan Lane include Sahara Avenue to Vegas Valley Drive and new bridge across the Las Vegas Wash
04/02/2019
Lumos and Associates
Carson City
Design Services for Reverview Lift Station Upgrade
no
Description: Lumos and Associates will provide design services for upgrades to be made at Carson City's Reverview Lift station.
03/29/2019
Jemison Surveying & Services
Clark County
Durrango Dr Blue to Windmill
no
Description: Approximately 1.5 mile road improvement project to widen Durango Dr. including adding median islands, storm drains, drop inlets street lights and traffic signals.
03/29/2019
Louis Berger US, Inc.
Clark County
Feasibility Studies = Sunrise Manor Trasp. Improvements
no
Description: Professional engineering services for the proposed 1-515 Interchange at Sahara Ave & the proposed Hollywood Blvd Extension
03/25/2019
SB Engineering
Truckee Meadows Water Authority
STMGID Well Bypass Improvements Phase 2
no
Description: Design and permit consulting services
03/25/2019
CME
Truckee Meadows Water Authority
PRS Roll Seal Replacements FY 19
no
Description: Material and compaction testing
03/20/2019
Lumos and Associates
City of Reno
2019 Preventative Maintenance Project
no
Description: Construction Management, Material Testing and Inspection Services
03/19/2019
CME
City of Reno
On-Call Material Testing and Inspection
no
Description: Material Testing ans Inspection Services
03/18/2019
Black Eagle Consulting, Inc.
City of Sparks
City of Sparks - FY19 Unit 2 - Materials Testing
no
Description: Provide field and lsb testing for street rehabilitation project FY19 - Unit 2
03/18/2019
Battle Born Ventures
City of Sparks
City of Sparks - FY19 Unit 2 - Survey
no
Description: Provide center line monument re-establishment and utility raiding surveys for street rehabilitation project, FY19 - Unit 2
03/15/2019
Lumos & Associates
Carson City
Rifle Range Proposed upgrades Design Services
no
Description: Engineering Services to design the proposed updated to the Carson City Rifle/Shooting Range.
Next Page